Skip to content
Sphere Systems

Commercial

Melbourne, VIC

461 Bourke St

From pneumatics to modern electronics, floor by floor.

230

Zones

461 Bourke St, Melbourne, VIC

Overview

Sphere Systems upgraded the HVAC controls from pneumatics to modern-day electronics.

Featuring 18 storeys of office space with on-site car parking, the central HVAC plant is intelligently controlled for optimum energy efficiency.

Perimeter induction units and internal re-heat zones are controlled to provide an even temperature across each floor, offsetting the variable heat load from the glass windows.

Scope

Investigation, design, construction, programming and commissioning.

Ready when you are

Have a site that needs attention?

New build, upgrade or an after-hours fault: talk to the engineers who design and support Sphere systems.